UPDATE: Steering column re route now sorted ("L" shaped rather than straight through). Two extra UJs, a support bearing on a "pillow mount" bolted to the driver side engine bay panel, extra 450mm long (14mm diameter) steel rod and cut down the originally supplied steering shaft to retain the T coupling at the top. Did not need to relocate the steering rack.
Next challenges are:
> Mount either the Marina pedal box and brake servo or the MX5 pedal box and servo unit, depending on which will not foul the new position of the steering shaft. Or go for another purpose-built floor-mounted box from a specialist maker (have seen a few)
> Get the gearbox end of the MX5 output drive shaft mated to the shortened Marina driveshaft and have it balanced.
> Finalise the position of the engine once the drive shaft is re-fitted and sort out the location and type of engine mounts I need.
> Then out comes the engine & gearbox to weld in the new engine mounts (once I've worked out the correct mix), fit new clutch basket, clutch plate and throw out bearing, then put the lot back in the engine bay and bolt the engine down and make up a gearbox support bracket similar to the original one that came with the kit.
Love it when I can lay out all my fantasies like this, ignoring all the little "gotchas" I'm going to have to overcome.
Bye fer now......![]()
Bookmarks