Click here to go to the code of conduct  Click here to go to the galleries  Click here to go to the video page  Click here to go to the SW Meets page  Click here to sign up
Page 1 of 3 1 2 3 LastLast
Results 1 to 10 of 23

Thread: Operation Blown Fuse Replacement: the total rebuild diary of a Marina based Roadster.

  1. #1
    frequent forum contributor DamnedFrog's Avatar
    Join Date
    Oct 2014
    Location
    France, Limousin
    Posts
    59

    Operation Blown Fuse Replacement: the total rebuild diary of a Marina based Roadster.

    Hello all

    Falling from Charybde to Scylla when I tried to fix things on the Roadster I bought from a german guy last november, all turned to be clear: It would be a complete rebuild.

    The car received its V5 in 1984 but prior that experienced a complicated birth: hole drilled and closed with mastic or left open everywhere, screws and nuts of very different quality from new stainless metric to used imperial, electric harness taken roughtly from the donor car and stretched to the limit...

    Yes Cameron, you were right, nothing but a complete rebuild was mandatory

    I was advised to open a diary, so here it is.

    Now the beauty is totally nacked, the serious game will begin with de-rusting and repainting.

    On the kitchen table Santa returned in April and all the necessary stuff for a brand new electric harness was received from English suppliers.

    Stay tuned
    Attached Images Attached Images

  2. #2
    Club Member dcunn's Avatar
    Join Date
    Nov 2011
    Posts
    1,250

    Re: Operation Blown Fuse Replacement: the total rebuild diary of a Marina based Roads

    OK looks like fun...what sort of time scale have you set to finish it ?

    Should we put this thread in with the build diaries ?

    Rgds DC

  3. #3
    frequent forum contributor DamnedFrog's Avatar
    Join Date
    Oct 2014
    Location
    France, Limousin
    Posts
    59

    Re: Operation Blown Fuse Replacement: the total rebuild diary of a Marina based Roads

    Yes indeed you can!

    Time scale... I would like that everything should be done this year.

    CAD work and chassis refurbishing should be carried out this month and during my holidays in may, let say that october is a fair target for first road tests.

    Christophe.

    Quote Originally Posted by dcunn View Post
    OK looks like fun...what sort of time scale have you set to finish it ?

    Should we put this thread in with the build diaries ?

    Rgds DC

  4. #4
    frequent forum contributor DamnedFrog's Avatar
    Join Date
    Oct 2014
    Location
    France, Limousin
    Posts
    59

    Re: Operation Blown Fuse Replacement: the total rebuild diary of a Marina based Roads

    Dashboard temporary CAD drawing, before laser cutting of alu sheet.

    The dashboard features two 3mm sheets: a frontal one to hold the gauges, warnings and switchs, and a structural one behind so that stiffness of the assembly is sufficent for 4 point holding (2 lateral and 2 top) and for withstanding weight and vibrations. I did that because Lucas switches can not stand more than 3mm of panel thickness. A single piece made of 5mm would have been much less expensive.

    Marlin_TdB_03.jpg

    All smiths electronic classic gauges:
    - Tacho 80mm on the right, Speedo 80mm on the left
    - Right side: water temperature and fuel level
    - Left side: voltage and engine head temperature

    Santa made faces at me, but this would be AGAIN Xmas in may

    Christophe.

  5. #5
    frequent forum contributor
    Join Date
    Nov 2011
    Location
    llandrinio Powys
    Posts
    1,785

    Re: Operation Blown Fuse Replacement: the total rebuild diary of a Marina based Roads

    I cant wait to see how that turns out

  6. #6
    frequent forum contributor Club Member David's Avatar
    Join Date
    Nov 2011
    Location
    High Wycombe
    Posts
    959

    Re: Operation Blown Fuse Replacement: the total rebuild diary of a Marina based Roads

    Make sure you have room to hold the gearstick in first and third gear without bashing your hand on the lower centre of the dash.
    - 9th Custodian of JRR 929D, the Triumph Vitesse based special Paul Moorehouse built prior to the Triumph based Roadster kits.
    - 8th owner of Roadster chassis number 2395. Kit manufactured 1983, first registered in 1987. Now owned by Barry!
    - Builder of chassis number 2325 (PKK 989M) in the mid 80's. Now owned by Eric & Lynne in the NE of England.

  7. #7
    frequent forum contributor DamnedFrog's Avatar
    Join Date
    Oct 2014
    Location
    France, Limousin
    Posts
    59

    Re: Operation Blown Fuse Replacement: the total rebuild diary of a Marina based Roads

    Hello David.

    I indeed took this in account, and therefore I reproduced the overall dimensions of the existing MDF dashboard, leaving enough room under for gearstick operation.

    And I'll use a thin rubber edge trim around the frontal sheet to prevent accidents

    Christophe.



    Quote Originally Posted by David View Post
    Make sure you have room to hold the gearstick in first and third gear without bashing your hand on the lower centre of the dash.

  8. #8
    frequent forum contributor DamnedFrog's Avatar
    Join Date
    Oct 2014
    Location
    France, Limousin
    Posts
    59

    Re: Operation Blown Fuse Replacement: the total rebuild diary of a Marina based Roads

    Hello Cameron.

    I'll do my best to maintain this diary as pleaseant to read as I can

    To do: learn to use... a digital camera.

    Christophe.

  9. #9
    Club Member Mike's Avatar
    Join Date
    Nov 2011
    Location
    Gosberton, South Lincs
    Posts
    1,376

    Re: Operation Blown Fuse Replacement: the total rebuild diary of a Marina based Roads

    If you can prepare CAD drawings like that, then Digital photos will not be a problem !

    Looks very impressive.

    Mike

    Quote Originally Posted by DamnedFrog View Post
    Hello Cameron.

    I'll do my best to maintain this diary as pleaseant to read as I can

    To do: learn to use... a digital camera.

    Christophe.

  10. #10
    frequent forum contributor DamnedFrog's Avatar
    Join Date
    Oct 2014
    Location
    France, Limousin
    Posts
    59

    Re: Operation Blown Fuse Replacement: the total rebuild diary of a Marina based Roads

    Good work today !

    - All paints (chassis/engine-gbox/manifold/radiator), primers, rust removers, cleaners and alu varnish ordered from RESTOM, a specialized French manufacturer with a very good reputation for classic car chemicals.

    - CAD design of dashboard is completed and transmitted for quotation of laser cutting (green:face/yellow:structure/magenta:dashboard and electricals holders)

    Marlin_TdB_05.jpg

    Stay tuned

Similar Threads

  1. Roadster Rebuild Diary from Cornwall
    By meverett in forum Build and Rebuild Diaries
    Replies: 203
    Last Post: 16-02-2019, 08:14 PM
  2. Replies: 0
    Last Post: 20-11-2017, 12:57 PM
  3. Operation Tank Replacement
    By andyf in forum Build and Rebuild Diaries
    Replies: 10
    Last Post: 21-12-2015, 09:59 AM
  4. Rebuild Diary MkI Roadster YTB 432
    By dcunn in forum Build and Rebuild Diaries
    Replies: 119
    Last Post: 10-04-2015, 09:42 PM
  5. The Start: Operation Phoenix - Marina Based MKII.
    By Waterscumbie in forum Roadster
    Replies: 10
    Last Post: 18-03-2015, 04:26 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •